Address |
1/F, Tai Po Tung Cheong Street Leisure Building |
Location |
|
Phone No. |
2691 2428, 2691 2433 |
Facilities |
^Training pool (Length 25m x Width 25m, Depth: 1.2m-1.4m)
^Teaching pool (Length 25m x Width 10m, Depth: 0.7m-0.9m)
^Jacuzzi (Depth: 0.85m)
Family changing room
Barrier Free Facilities: Barrier Free Access, Accessible Lifting Platform, Ramp (Teaching Pool), Accessible Toilet, Accessible Services Counter, Visual Fire Alarm System, Tactile Guide Path, Braille Directory Map and Floor Plan
|
|
Summer Opening Schedule Information
|
|
Apr |
May |
Jun |
Jul |
Aug |
Sep |
Oct |
1st Session: 6:30 am - 12:00 nn
2nd Session: 1:00 - 6:00 pm
3rd Session: 7:00 - 10:00 pm
(Session breaks: 12:00 nn - 1:00 pm & 6:00 - 7:00 pm)
| Maintenance
11.9.2024 - 31.10.2024 |
|
|
Temporary Closure for Annual Maintenance
|
From 11 September to 31 October
|
|
Weekly Cleansing Operation
The weekly cleansing operation is carried out at public swimming pools managed by the LCSD from 10:00 a.m. to the end of the second session. The pools will resume service at the third session on the same day. ※ If the cleansing day falls on a public holiday, the swimming pool will open as usual and the weekly cleansing operation will be rescheduled for another weekday (as shown in the bracket) of the same week.
|
Every Thursday
(Friday ※)
|
|
|
Notice of Temporary ClosureDetails of the temporary partial closure of facilities at swimming pools: Please contact the officers-in-charge of the respective swimming pools on the phone number(s) listed above for details of the latest arrangements. |
Date & Time |
Facilities |
Reason |
Remarks |
2024/07/02 06:30 - Until further notice |
All Indoor Facilities (Training pool, Teaching pool, Jacuzzi)
|
Urgent Repairs
|
N/A
|
|
Photo |
![Photo Photo](https://www.lcsd.gov.hk/en/beach/common/graphics/SP/small/Tung%20Cheong%20Street%20SP.jpg) |